SMOOCHY POOCHY 5/8”x15’ POLY LONG LEAD BLACK
Smoochy Poochy
SKU: 2079-15BK
This water proof Smoochy Poochy long lead will be perfect for your outdoor adventures!
Smoochy Poochy’s training leads (also called long lines), are available in vibrant orange or classic black.
The long lines give your dog freedom on their walks, helpful while training and are an effective way to practice recall.
NOTE: These leads are not designed to be used as a tie-out.
- LEASH MATERIAL: Biothane (also referred to as polyvinyl).
- CLEANING: Wipe polyvinyl lead with a damp cloth, or rinse using warm water and a gentle cleaning product such as Palmolive dish soap. Pat dry.
- CHEWING: Biothane is not chew proof.
- COLOUR: Colour swatches and colour pictures may vary on different screens.
- DIMENSIONS: Product dimensions may vary slightly.